Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 115: 2010-070-00 EXP WA ESTUARY MOA PROJECT (WDFW)
Project Number:
Title:
Lower Columbia River Estuary Scoping & Implementation
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 100.00%
Contract Number:
74314 REL 115
Contract Title:
2010-070-00 EXP WA ESTUARY MOA PROJECT (WDFW)
Contract Continuation:
Previous: Next:
74314 REL 84: 2010-070-00 EXP WA ESTUARY MOA PROJECT DEVELOPMENT
Contract Status:
Closed
Contract Description:
The federal Action Agencies that operate the Federal Columbia River Power System (FCRPS) have asked the state of Washington to join in a partnership to expedite habitat restoration efforts for salmon and steelhead in the Columbia River Estuary below Bonneville Dam. On  September 16, 2009 the Washington Governor and Director of Washington Department of Fish and Wildlife (WDFW) signed the Estuary Habitat Memorandum of Agreement (Estuary MOA) with the Action Agencies. The Estuary MOA established a nine-year funding arrangement for habitat restoration in the lower Columbia River and tidally influenced tributaries – from Bonneville Dam to the mouth of the Columbia River where it flows into the Pacific Ocean. In April 2020, an MOU was established between Washington and BPA to extend the partnership through 2023.

During this contract period, WDFW will: coordinate tasks for the Chinook Estuary restoration work, South Unit Shillapoo and Buckmire Slough Restoration Project, initialize post-project monitoring for the South Bachelor Island Restoration Project, continue support of restoration projects previously completed, and evaluate additional projects if the opportunities arise. Key tasks include concept design, permitting, AEMR, maintaining fish access to restoration projects, public involvement, and evaluation of project needs.
Account Type(s):
Expense
Contract Start Date:
09/01/2020
Contract End Date:
08/31/2021
Current Contract Value:
$431,732
Expenditures:
$431,732

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. BPA administrative tasks for contract 08/31/2021 08/31/2021
Environmental compliance is complete C: 165. Environmental Compliance 08/31/2021 08/31/2021
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces D: 114. Evaluate potential estuary restoration projects 04/30/2021 04/30/2021
Maintain Tide gate at Chinook estuary site E: 186. CHINOOK-- Tide Gate Management 08/31/2021 08/31/2021
Remove invasive plant species and maintain fencing F: 199. CHINOOK-- Remove Invasive Species 08/31/2021 08/31/2021
Remove outbuilding and old house G: 27. CHINOOK-- Remove old house and outbuildings 08/31/2021 08/31/2021
Maintain site conditions at S. Bachelor Island H: 186. SOUTH BACHELOR ISLAND-- Maintain habitat 08/31/2021 08/31/2021
Conduct site monitoring work at South Bachelor Island I: 157. SOUTH BACHELOR ISLAND-- Evaluate habitat 08/31/2021 08/31/2021
Produce 20% Design for South Unit Shillapoo J: 175. SOUTH UNIT SHILLAPOO-- Produce 20% Design 08/31/2021
Provide Public and Stakeholder Outreach K: 99. SOUTH UNIT SHILLAPOO-- Public and stakeholder outreach 08/31/2021 08/31/2021
Produce accessible, error-checked datasets L: 157. SOUTH UNIT SHILLAPOO--Collect Pre-restoration site data 08/31/2021 08/31/2021
Produce accessible, error-checked datasets for Level 3 AEMR sites and deliver to LCEP M: 157. LEVEL 3 AEMR--Perform pre and post construction AEMR 08/31/2021 08/31/2021
Completed Annual Report N: 132. Submit Progress Report for the period (Sep 2019) to (Aug 2020) 02/28/2021 02/12/2021
Treat invasive species (mainly Scotch broom) in the uplands at the South Bachelor Island restoration site O: 199. ***CCR-46072--SOUTH BACHELOR ISLAND-- Invasive Species Removal 08/31/2021 08/31/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 2 instances of WE 199 Remove Vegetation
  • 1 instance of WE 27 Remove Debris
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 BPA administrative tasks for contract
C 165 Environmental Compliance
D 114 Evaluate potential estuary restoration projects
E 186 CHINOOK-- Tide Gate Management 09/22/2020
F 199 CHINOOK-- Remove Invasive Species
G 27 CHINOOK-- Remove old house and outbuildings 06/16/2021
H 186 SOUTH BACHELOR ISLAND-- Maintain habitat 09/01/2020
I 157 SOUTH BACHELOR ISLAND-- Evaluate habitat 08/10/2020
J 175 SOUTH UNIT SHILLAPOO-- Produce 20% Design
K 99 SOUTH UNIT SHILLAPOO-- Public and stakeholder outreach
L 157 SOUTH UNIT SHILLAPOO--Collect Pre-restoration site data 09/01/2020
M 157 LEVEL 3 AEMR--Perform pre and post construction AEMR 09/22/2020
N 132 Submit Progress Report for the period (Sep 2019) to (Aug 2020)
O 199 ***CCR-46072--SOUTH BACHELOR ISLAND-- Invasive Species Removal 06/28/2021